Completed
January 2021
Services
Interior Renovation
Status
Completed
Photos
25 Images
Interior Renovation

Project Overview

Renovation Period: 2 months.<br /> Project Detail: Interior Renovation.<br /> Cost: $ 34,700<br /> Homeowner’s Review: I have 4-5 times experience of renovation, but this time is the first time doing renovation through Reno Compass. Their Cooperation is over predicted. It is very happy. The renovation of Ryan has high quality of time management, good effectiveness. Every stuff is quite kind. I strongly recommend this team,the very last percent of renovation makes us very comfortable. I have to say the 99% of renovation are almost same to most team, but the last 1% job is even worse. However, the team of Ryan arrange their very professional workers so that we could have a very perfect ending.<br /> I will thank you for providing new experience of renovation by Reno Compass. I hope we will have another cooperation in the future.

Project Gallery

25 Photos
GET YOUR FREE ESTIMATE

Similar Projects

Explore more inspiring work

Markham Interior Renovation
Interior Renovation

Markham Interior Renovation

Markham Interior Renovation Layout Transformation Main Floor: Removed the load-bearing wall between the kitchen and living room to open up the space and extend the island. Demolished the original powder room and partition walls to make the living room more spacious. Converted the laundry room by the garage entrance into a powder room with a shower — perfect for seniors or quick rinses. Second Floor: Bathrooms, bathrooms, and more bathrooms! Upgraded from “4 bedrooms and 3 baths” to “4 bedrooms and 4 baths,” giving each bedroom its own ensuite for better privacy and added home value. Converted the hallway space into a new laundry room while keeping the den’s usable area. The owner says this is their favorite upgrade — no more carrying baskets of laundry up and down the stairs! Staircase: The most “magical” change — the staircase was reversed and redesigned as a steel-structure floating staircase from the main floor to the basement, adding openness and modern style. Skylights: Added 3 skylights in the second-floor hallway and primary ensuite, ensuring bright natural light even without turning on the lights during the day. The second-floor den is now the perfect spot to sip coffee and read a book — instant cozy vibes! Color & Materials Main Palette: Warm natural wood tones with black accents for a modern, minimalist, yet inviting feel. Paint: Benjamin Moore OC-17 White Dove. Tiles: Kitchen and bathrooms upgraded to large-format porcelain tiles with stone textures from Olympia Tile — combining elegance and easy maintenance.

View Project
CONTACT US & GET YOUR ESTIMATE

Or call us directly: (905)-597-8566